Local News

DOT Requesting Public’s Feedback on Fayette County Bridge Project

The DOT wants the public’s feedback on a proposed bridge project in Fayette County.

The bridge on Highway 3 over the Maquoketa River about two miles east of Highway 187 is proposed to be replaced during the 2025 construction season, with through traffic maintained at all times. 

A virtual presentation about the proposed project is taking place over the next couple weeks so the public can learn more about it. If you’re interested, log on to iowadot.gov/pim and click on the “IA 3 Bridge Replacement Maquoketa River”. The virtual presentation will be available anytime between May 25th and June 8th. You can experience a self-guided tour of the proposed improvements and submit comments and questions.

If you don’t have access to the internet or need help viewing the materials, contact the DOT at 641-423-7584. 

Comments will be accepted through June 8th.

Stay Connected with 94.7 KMCH

Add 94.7 KMCH as a preferred source on Google to see more local news, weather, and sports in your feed.

Add on Google

Follow us on Facebook for breaking news, severe weather alerts, sports, and more.

ADVERTISEMENT
Back to top button